Hosting a charging station

"*" indicates required fields

Site location*
Hidden
Hidden
This field is for validation purposes and should be left unchanged.

We are looking for new sites to set up an Oreve station

Landowners
Local Communities
Companies

Would you like to get a return on your land reserves by installing an ultra-fast charging station on your site? Our teams will support you from start to finish.

Because the development of electric mobility in France requires the construction of a dense network of stations as close as possible to users’ needs, Oreve is building and operating the first very high-power public charging network, located in business and industrial areas close to low-emission areas.

Your Regional Partner in the environment transition

Oreve, a subsidiary of the Ortec Group, relies on a dense territorial network of its Group agencies to set up a national network of local charging stations. Winners of an ADEME award, our stations are designed to accommodate all types of vehicle simultaneously, to support the transition to low-carbon mobility for professionals and private individuals alike.
255 high-power charging stations
in service in France by 2030.
43 LEZs (Low Emission Zones)
deployed by 2025 to accelerate the transition to electromobility.
100% carbon-free
to power Oreve terminals, i.e. 1.5 million tons of CO2 avoided by 2030.

Oreve : high-performance, dependable, and secure infrastructures

High-performance, safe stations

Our stations are accessible 24 hours a day on fully secure sites. Charging times are optimized (30 minutes) thanks to the latest generation of chargers (360 and 400 kW), and a power reserve allowing dedicated management of electrical equipment.
Reliable equipment and premium maintenance
Oreve relies on the recognized multi-technical expertise of Brunet, a subsidiary of the Ortec Group, in the deployment and maintenance of facilities dedicated to renewable energies, guaranteeing the reliability of equipment with an availability rate of 98%.